Edgewood, WA · Pierce County
Fire LP Tank Installation Submittal Checklist
This checklist helps property owners, contractors, and applicants assemble a complete submittal for a new or relocated liquid propane storage tank.
What this form is
Edgewood requires a liquid propane tank installation application for any new or relocated storage tank. The checklist identifies four required submittal items: a signed Building and Fire Prevention Permit Application, a site plan, a project narrative, and the manufacturer’s manual and cut sheets. It also asks applicants to explain any omitted items and notes that additional materials may be requested during review.
Who needs it
Applicants proposing a new or relocated liquid propane storage tank in Edgewood need this checklist to prepare their permit submittal.
How to submit it
Upload PDF copies of the documents to the City’s Permit Portal at portal.cityofedgewood.org. Name each item as identified in the checklist and include the project name and applicant name and address on every document.
About notarization
This checklist has no notary block; its required permit application must be signed, and no sworn or notarized attachment is listed.
How to submit this form
- 1
Download The Checklist
Download the Fire LP Tank Installation Submittal Checklist PDF.
- 2
Complete The Checklist
Identify any omitted items and explain the reason using the corresponding item number.
- 3
Gather Required Documents
Prepare the signed permit application, site plan, project narrative, and manufacturer’s manual and cut sheets.
- 4
Submit To The City
Upload PDF copies to the City’s Permit Portal, following the checklist’s file naming and document labeling instructions.
Frequently asked questions
- What does the Fire LP Tank Installation Submittal Checklist require?
- It lists a signed Building and Fire Prevention Permit Application, a site plan, a project narrative, and the manufacturer’s installation manual and tank specification cut sheets.
- Do I need a notary for the Fire LP Tank Installation Submittal Checklist?
- No. The checklist has no notary block. Its required permit application must be signed, and the checklist does not list a sworn or notarized attachment.
- How do I submit the Fire LP Tank Installation Submittal Checklist?
- Upload PDF copies of the checklist items to the City’s Permit Portal at portal.cityofedgewood.org. Name each item as listed and include the project name and applicant name and address on every document.
- What if I omit an item from the tank installation submittal?
- Use the corresponding item number to explain the reason for omission on the checklist. The submittal may be deemed incomplete if it does not meet the checklist’s minimum requirements.
Need something notarized?
This Fire LP Tank Installation Submittal Checklist doesn’t need a notary — but if you have another Edgewood form that does, a commissioned online notary can help.
