Edgewood, WA · Pierce County

No notary required

Fire Suppression Submittal Checklist

This checklist helps applicants submitting plans for installation or alteration of a pre-engineered kitchen hood fire-suppression system assemble the required materials.

What this form is

Use this checklist when submitting materials for installation or alteration of a pre-engineered kitchen hood fire-suppression system. It lists the permit application, plans, certificates, manuals, and appliance information needed for a complete submittal, and provides space to explain any omitted items. The city may request additional materials during review, and incomplete submittals may not meet the checklist’s minimum requirements.

Who needs it

Applicants proposing to install or alter a pre-engineered kitchen hood fire-suppression system should use this checklist with their submittal.

How to submit it

Upload PDF copies of the documents to the City’s Permit Portal at portal.cityofedgewood.org. Name each item as identified in the checklist and include the project name and applicant name and address on every document.

About notarization

This checklist has no notary requirement; its listed permit application must be completed and signed, and no attachment is described as sworn or notarized.

How to submit this form

  1. 1

    Download The Checklist

    Download the Fire Suppression Submittal Checklist PDF.

  2. 2

    Complete The Checklist

    Review the listed submittal requirements and explain any omitted item by its corresponding number.

  3. 3

    Gather The Documents

    Prepare PDF copies of the required application, plans, certificates, manuals, and appliance information.

  4. 4

    Submit To The City

    Upload the PDFs to the City’s Permit Portal, using the listed document names and including project and applicant details on every document.

Frequently asked questions

What is the Fire Suppression Submittal Checklist for?
It lists the documents needed for installation or alteration of a pre-engineered kitchen hood fire-suppression system, including plans, certificates, and manuals.
How do I submit the fire suppression checklist?
Upload PDF copies through the City’s Permit Portal at portal.cityofedgewood.org. Name each document as listed and include the project name and applicant name and address on every document.
Do I need a notary for the Fire Suppression Submittal Checklist?
No. The checklist has no notary requirement. Its listed permit application must be completed and signed, but no attachment is described as sworn or notarized.
What if I cannot provide a listed document?
Explain the reason for omission using the corresponding item number in the space provided at the end of the checklist.

Need something notarized?

This Fire Suppression Submittal Checklist doesn’t need a notary — but if you have another Edgewood form that does, a commissioned online notary can help.