Edgewood, WA · Pierce County

No notary required

Fire Tent/Membrane Structure Submittal Checklist

This checklist helps applicants prepare the plans and supporting documents required for Edgewood tent and membrane structure permit submittals.

What this form is

Edgewood requires tent permits for membrane structures, canopies, or tents over 400 square feet, or clusters of tents over 700 square feet. Applicants use this checklist to assemble a Building and Fire Prevention Permit Application, site plan, construction plans, and manufacturer installation information and specifications. It also lists plan details, fire-safety requirements, and separate electrical and temporary use permit steps.

Who needs it

Applicants seeking permits for tents, canopies, or membrane structures that exceed the listed size thresholds use this checklist to prepare a complete submittal.

How to submit it

Upload PDF copies through the City’s Permit Portal at portal.cityofedgewood.org. Name each item as identified in the checklist and include the project name and applicant name and address on every document.

About notarization

This checklist does not require notarization; the referenced permit application must be completed and signed, and no sworn attachment is identified.

How to submit this form

  1. 1

    Download The Checklist

    Download the Fire Tent/Membrane Structure Submittal Checklist PDF.

  2. 2

    Complete The Required Application

    Complete and sign the Building and Fire Prevention Permit Application identified in the checklist.

  3. 3

    Gather The Required Documents

    Prepare the site plan, construction plans, and manufacturer installation manual and specifications; explain any omitted item.

  4. 4

    Upload Your Submittal

    Upload PDF copies to portal.cityofedgewood.org, following the checklist’s naming and document-labeling instructions.

Frequently asked questions

Who uses the Fire Tent/Membrane Structure Submittal Checklist?
Applicants preparing permit submittals for membrane structures, canopies, or tents over 400 square feet, or clusters of tents over 700 square feet, use this checklist.
What documents does the checklist identify?
It identifies a completed and signed Building and Fire Prevention Permit Application, a site plan, construction plans, and the manufacturer’s installation manual and specifications.
Do I need a notary for the Fire Tent/Membrane Structure Submittal Checklist?
No. The checklist does not require notarization. The referenced permit application must be completed and signed, and the checklist identifies no sworn attachment.
How do I submit the Fire Tent/Membrane Structure Checklist?
Upload PDF copies through Edgewood’s Permit Portal. Name each item as identified in the checklist and put the project name and applicant name and address on every document.

Need something notarized?

This Fire Tent/Membrane Structure Submittal Checklist doesn’t need a notary — but if you have another Edgewood form that does, a commissioned online notary can help.