Edgewood, WA · Pierce County
Tank Removal/Decommissioning Submittal Checklist
This checklist identifies the documents property owners or applicants must submit for a tank removal or decommissioning application in Edgewood.
What this form is
Edgewood requires a tank removal or decommissioning application for fuel or storage tanks that are no longer in use. This checklist outlines the minimum submittal items: a completed and signed Building and Fire Prevention Application, a site plan, a project narrative, and an Underground Storage Tank Decommissioner certification with a copy of the current ICC certificate. Explain any omitted items using their corresponding numbers.
Who needs it
Property owners or applicants seeking to remove or decommission a fuel or storage tank in Edgewood need this checklist and the listed application materials.
How to submit it
Upload PDF copies of the documents to the City’s Permit Portal at portal.cityofedgewood.org, naming each item as identified in the checklist and including the project and applicant name and address on every document.
About notarization
This checklist does not require a notary; the related Building and Fire Prevention Application must be completed and signed, and no notarized or sworn attachment is identified.
How to submit this form
- 1
Download The Checklist
Download the Tank Removal/Decommissioning Submittal Checklist PDF.
- 2
Complete The Application Materials
Prepare the signed Building and Fire Prevention Application, site plan, and project narrative with the details listed in the checklist.
- 3
Gather Required Certification
Include the Underground Storage Tank Decommissioner certification and a copy of the individual's current ICC certificate.
- 4
Upload To The City
Upload PDF copies to the City’s Permit Portal, naming each document as listed and including the project and applicant name and address on every document.
Frequently asked questions
- What documents does the tank removal checklist require?
- It lists a signed Building and Fire Prevention Application, a site plan, a project narrative, and an Underground Storage Tank Decommissioner certification with a copy of the current ICC certificate.
- How do I submit the tank removal checklist?
- Upload PDF copies of the documents to the City’s Permit Portal. Name each item as identified in the checklist and include the project and applicant name and address on every document.
- Do I need a notary for the Tank Removal/Decommissioning Submittal Checklist?
- No. The checklist does not require a notary. The related Building and Fire Prevention Application must be completed and signed; no notarized or sworn attachment is identified.
- What should I do if I cannot provide a checklist item?
- Explain the reason for omission at the end of the document using the corresponding item number. The checklist says a submittal may be deemed incomplete if it does not meet the minimum requirements.
Need something notarized?