This checklist identifies the documents property owners or applicants must submit for a tank removal or decommissioning application in Edgewood.

What this form is

Edgewood requires a tank removal or decommissioning application for fuel or storage tanks that are no longer in use. This checklist outlines the minimum submittal items: a completed and signed Building and Fire Prevention Application, a site plan, a project narrative, and an Underground Storage Tank Decommissioner certification with a copy of the current ICC certificate. Explain any omitted items using their corresponding numbers.

Who needs it

Property owners or applicants seeking to remove or decommission a fuel or storage tank in Edgewood need this checklist and the listed application materials.

How to submit it

Upload PDF copies of the documents to the City’s Permit Portal at portal.cityofedgewood.org, naming each item as identified in the checklist and including the project and applicant name and address on every document.

About notarization

This checklist does not require a notary; the related Building and Fire Prevention Application must be completed and signed, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Checklist

    Download the Tank Removal/Decommissioning Submittal Checklist PDF.

  2. 2

    Complete The Application Materials

    Prepare the signed Building and Fire Prevention Application, site plan, and project narrative with the details listed in the checklist.

  3. 3

    Gather Required Certification

    Include the Underground Storage Tank Decommissioner certification and a copy of the individual's current ICC certificate.

  4. 4

    Upload To The City

    Upload PDF copies to the City’s Permit Portal, naming each document as listed and including the project and applicant name and address on every document.

Frequently asked questions

What documents does the tank removal checklist require?
It lists a signed Building and Fire Prevention Application, a site plan, a project narrative, and an Underground Storage Tank Decommissioner certification with a copy of the current ICC certificate.
How do I submit the tank removal checklist?
Upload PDF copies of the documents to the City’s Permit Portal. Name each item as identified in the checklist and include the project and applicant name and address on every document.
Do I need a notary for the Tank Removal/Decommissioning Submittal Checklist?
No. The checklist does not require a notary. The related Building and Fire Prevention Application must be completed and signed; no notarized or sworn attachment is identified.
What should I do if I cannot provide a checklist item?
Explain the reason for omission at the end of the document using the corresponding item number. The checklist says a submittal may be deemed incomplete if it does not meet the minimum requirements.

Need something notarized?

This Tank Removal/Decommissioning Submittal Checklist doesn’t need a notary — but if you have another Edgewood form that does, a commissioned online notary can help.