Steilacoom, WA · Pierce County

No notary required

Accessory Dwelling Unit Permit Application

Property owners use this application to request a Steilacoom permit for one or two accessory dwelling units and provide property, unit, and lot information.

What this form is

The application is for property owners proposing one or two accessory dwelling units on a lot in Steilacoom. It asks for owner and property details, proposed unit type and square footage, lot area, and the footprint of buildings on the lot. Applicants check applicable design requirements and any setback exceptions, then certify the information and sign and date the application; the form lists a $150 fee.

Who needs it

A property owner proposing one or two accessory dwelling units on a Steilacoom lot uses this application to request a permit.

How to submit it

Submit it to the city department named on the form; check the city website for current contact details.

About notarization

This application is signed and dated by the property owner without a notary; it lists no sworn attachment or notarized related step.

How to submit this form

  1. 1

    Download the Application

    Download the Accessory Dwelling Unit Permit Application PDF.

  2. 2

    Complete the Property Details

    Enter the owner and property information, proposed ADU details, lot area, and building footprint.

  3. 3

    Check Requirements

    Review and check the listed design requirements and any applicable setback exceptions.

  4. 4

    Sign and Submit

    The property owner signs and dates the application, then submits it to the city department named on the form.

Frequently asked questions

What does the Accessory Dwelling Unit Permit Application ask for?
It requests owner and property details, proposed ADU type and square footage, lot area, building footprint, and checks for design requirements and applicable setback exceptions.
Who uses the Steilacoom ADU permit application?
A property owner proposing one or two accessory dwelling units on a lot uses the application to request a permit.
Do I need a notary for the Accessory Dwelling Unit Permit Application?
No. The property owner signs and dates this application without a notary; the form lists no sworn attachment or notarized related step.
How do I submit the Accessory Dwelling Unit Permit Application?
Submit it to the city department named on the form; check the city website for current contact details.

Need something notarized?

This Accessory Dwelling Unit Permit Application doesn’t need a notary — but if you have another Steilacoom form that does, a commissioned online notary can help.