Lacey, WA · Thurston County
Engineer’s Civil Drawings Certification and Checklist Verification
Engineers use this form to certify civil drawings submitted to the City of Lacey and confirm they reviewed the checklist and included its items.
What this form is
The engineer of record uses this form to certify that civil drawings for a named project were prepared by or under their supervision and meet or exceed the stated standards. Before submitting the drawings to the City of Lacey for review, the engineer confirms that checklist items are included. The form also states the engineer’s responsibility for drawing accuracy and provides spaces for a signature, date, and engineer’s seal.
Who needs it
The engineer of record preparing or supervising civil drawings for submission to the City of Lacey completes this certification.
How to submit it
The form says to submit the civil drawings to the City of Lacey for review, after carefully reviewing the checklist and confirming its items are included.
About notarization
This certification is signed and dated without a notary; the form also provides space for the engineer’s seal.
How to submit this form
- 1
Download The Form
Download the Engineer’s Civil Drawings Certification and Checklist Verification form.
- 2
Complete The Certification
Enter the project name, review the checklist, and confirm its items are included in the civil drawings.
- 3
Sign And Add The Seal
The engineer of record signs and dates the form and provides the engineer’s seal.
- 4
Submit For City Review
Submit the certified form with the civil drawings to the City of Lacey for review.
Frequently asked questions
- What does the Engineer’s Civil Drawings Certification certify?
- The engineer certifies that the project’s civil drawings were prepared by or under their supervision and meet or exceed the stated standards, and confirms checklist items are included.
- Who completes this form?
- The engineer of record responsible for preparing or supervising the civil drawings completes the certification, signs and dates it, and provides the engineer’s seal.
- How do I submit the civil drawings?
- Review the checklist, confirm its items are included in the drawings, and submit the drawings to the City of Lacey for review.
- Do I need a notary for this certification?
- No. The certification is signed and dated without a notary; the form provides space for the engineer’s seal.
Need something notarized?
This Engineer’s Civil Drawings Certification and Checklist Verification doesn’t need a notary — but if you have another Lacey form that does, a commissioned online notary can help.
