Lacey, WA · Thurston County

No notary required

Sign Permit Application

Property owners and sign contractors use this application to provide project, contact, contractor, and sign details for a sign permit in Lacey.

What this form is

The Sign Permit Application collects project and applicant information for proposed signs in Lacey. It asks for property and contractor details, sign counts and measurements, and the applicant’s certification of property owner approval and compliance with applicable laws and regulations. Include complete plans with structural calculations, a site plan, and electrical drawings and details if applicable.

Who needs it

A permit applicant seeking approval for signs on a property in Lacey completes the form and confirms they have the property owner’s approval.

How to submit it

Email the application and required documents to [email protected], as directed on the form.

About notarization

This application does not require a notary; the applicant signs and dates it, and no notarized or sworn attachment is identified.

How to submit this form

  1. 1

    Download The Application

    Download the Sign Permit Application for the proposed sign project.

  2. 2

    Complete The Form

    Fill in the project, applicant, contractor, property, and sign information, then sign and date the application.

  3. 3

    Gather Required Plans

    Include complete plans with structural calculations, a site plan, and electrical drawings and details, if applicable.

  4. 4

    Email The Application

    Email the application and required documents to [email protected].

Frequently asked questions

Do I need a notary for the Sign Permit Application?
No. The application does not require a notary; the applicant signs and dates it, and no notarized or sworn attachment is identified.
How do I submit the Sign Permit Application?
Email the completed application and required documents to [email protected], as directed on the form.
What information does the application ask for?
It asks for project and applicant contacts, contractor details, parcel and property information, sign counts and measurements, and the applicant’s certification.
What plans should I include?
The form calls for complete plans, including structural calculations, a site plan, and electrical drawings and details, if applicable.

Need something notarized?

This Sign Permit Application doesn’t need a notary — but if you have another Lacey form that does, a commissioned online notary can help.