Dublin, CA · Alameda County
Final or Parcel Map Review Checklist
This checklist helps an engineering or surveying firm verify a final or parcel map before submitting it to Dublin for examination and filing.
What this form is
The Public Works Department checklist is submitted with a final or parcel map for examination and filing. The engineering or surveying firm uses it to review map completeness and consistency, mark each item as compliant or not applicable, and provide firm, contact, developer, parcel, property, and approval information. It covers map content, dedications, certificates, monumentation, calculations, supporting documents, and map-check deposit information.
Who needs it
An engineering or surveying firm preparing a final or parcel map for examination and filing in Dublin should complete and submit this checklist with the map.
How to submit it
Submit the checklist with the accompanying map to the Public Works Department for examination and filing. The form lists a map-check deposit and refers users to the current Master Fee Schedule.
About notarization
This checklist is signed without a notary; it says map certificates and statements must be signed and acknowledged, but does not specify that those related signatures require notarization.
How to submit this form
- 1
Download The Checklist
Download the Final or Parcel Map Review Checklist PDF.
- 2
Complete The Checklist
Mark each item as compliant or not applicable, complete the requested information, and sign the checklist.
- 3
Gather Map Documents
Prepare the map and any applicable supporting documents or written exception requests listed by the checklist.
- 4
Submit To Public Works
Submit the checklist with the accompanying map to the Public Works Department for examination and filing.
Frequently asked questions
- Do I need a notary for the Final or Parcel Map Review Checklist?
- No. The checklist itself is signed without a notary. It calls for signed and acknowledged map certificates and statements but does not specify that those related signatures require notarization.
- How do I submit the Final or Parcel Map Review Checklist?
- Submit the completed checklist with the accompanying map to the Public Works Department for examination and filing.
- What does the checklist ask reviewers to check?
- It covers map form and content, dedications and certificates, monumentation, mathematical accuracy, supporting documents, and map-check deposit information.
- Who completes this checklist?
- The checklist is intended for the engineering or surveying firm submitting a final or parcel map. It includes fields for firm and contact information, developer, parcel numbers, and property address.
Need something notarized?
This Final or Parcel Map Review Checklist doesn’t need a notary — but if you have another Dublin form that does, a commissioned online notary can help.
