Randolph, MT · Morris County
Framing Checklist
Builders or their representatives use this checklist to record framing details for a building inspection in Randolph.
What this form is
This checklist covers framing items such as floor joists, walls, beams, roof framing, and sheathing, with checks against the plans and code requirements. The builder or representative checks items marked “B,” while the building inspector checks items marked “I”; the responsible person in charge of work and inspector initial and date the form. It includes spaces for the lot, block, and permit number.
Who needs it
Builders or their representatives and building inspectors use this checklist to record and verify framing details for a building.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
No notary is required; the responsible person in charge of work signs, initials, and dates the checklist, and the building inspector initials and dates it.
How to submit this form
- 1
Download The Checklist
Download the Framing Checklist PDF.
- 2
Complete The Checks
The builder or representative checks items marked “B”; the building inspector checks items marked “I.”
- 3
Add Project Details
Enter the lot, block, and permit number in the spaces provided.
- 4
Sign And Date
The responsible person in charge of work signs, initials, and dates the checklist; the inspector initials and dates it.
- 5
Submit To The City
Submit it to the city department named on the form; check the city website for current contact details.
Frequently asked questions
- What does the Framing Checklist cover?
- It lists framing items to check, including floors, walls, beams, roof framing, and sheathing, with references to plans and code requirements.
- Who completes the Framing Checklist?
- The builder or the builder’s representative checks items marked “B.” The building inspector checks items marked “I”; both roles have spaces to initial and date.
- Do I need a notary for the Framing Checklist?
- No. The responsible person in charge of work signs, initials, and dates the checklist, and the building inspector initials and dates it; no notary is specified.
- How do I submit the Framing Checklist?
- The checklist does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Framing Checklist doesn’t need a notary — but if you have another Randolph form that does, a commissioned online notary can help.
