Mantoloking, MT · Ocean County

No notary required

Bulkhead Permit Application Form

Property owners use this application to request a bulkhead permit and provide project, property, engineer, contractor, and cost information.

What this form is

This application requests information for a bulkhead permit, including the property address, owner, engineer, contractor, proposed bulkhead elevation and length, and project cost. Submit it with a $300 permit fee, two paper copies and one PDF copy, along with signed and sealed engineering drawings and calculations and a permit or exemption from the appropriate state or federal agencies.

Who needs it

Property owners seeking a bulkhead permit should complete this application and provide the listed project details and supporting materials.

How to submit it

Submit the completed application with the $300 fee, two paper copies, one PDF copy, engineering drawings and calculations, and agency permit or exemption. Submit it to the city department named on the form; check the city website for current contact details.

About notarization

No notary is required; engineering drawings and calculations must be signed and sealed, while the application itself lists no applicant signature or notarization.

How to submit this form

  1. 1

    Download The Application

    Download the Bulkhead Permit Application Form.

  2. 2

    Complete The Property And Project Details

    Provide the property address, owner and contact details, engineer and contractor contacts, bulkhead elevation and length, and project cost.

  3. 3

    Gather Required Attachments

    Include signed and sealed engineering drawings and technical specifications, signed and sealed calculations, and an appropriate agency permit or exemption.

  4. 4

    Submit The Application

    Submit two paper copies and one PDF copy with the $300 permit fee and required materials; the form does not specify a submission destination.

Frequently asked questions

Do I need a notary for the Bulkhead Permit Application?
No. The application does not require notarization; however, the engineering drawings and calculations must be signed and sealed.
How do I submit the Bulkhead Permit Application?
Submit the completed application with the $300 fee, two paper copies, one PDF copy, signed and sealed engineering drawings and calculations, and an agency permit or exemption. The form does not name a submission department.
What supporting materials does the application require?
It lists signed and sealed engineering drawings and technical specifications, signed and sealed engineering calculations, and a permit or exemption from appropriate state or federal agencies.

Need something notarized?

This Bulkhead Permit Application Form doesn’t need a notary — but if you have another Mantoloking form that does, a commissioned online notary can help.