Auburn, WA · King County
Contractors Material and Test Certificate
Contractors use this certificate to document installation and testing of fire alarm and fire detection systems for Fire Department acceptance testing.
What this form is
The certificate documents a fire alarm or fire detection system’s installation, pre-testing, equipment, monitoring, and test results. Contractors complete it for a system that is ready for Fire Department acceptance testing, providing permit, facility, contractor, and equipment details along with test responses and a signature and date.
Who needs it
Contractors responsible for installing and pre-testing a fire alarm or fire detection system ready for Fire Department acceptance testing need this certificate.
How to submit it
Completely fill out the certificate and fax it to the Valley Regional Fire Authority Fire Marshal’s Office at 253-288-5970.
About notarization
This certificate is signed and dated without a notary; the form does not identify any attachment or related step that must be notarized or sworn.
How to submit this form
- 1
Download The Certificate
Download the Contractors Material and Test Certificate.
- 2
Complete The Form
Enter the requested contractor, facility, permit, equipment, monitoring, and system test information.
- 3
Sign And Date
Sign and date the completed certificate.
- 4
Fax To The Fire Marshal’s Office
Fax the completed certificate to the Valley Regional Fire Authority Fire Marshal’s Office at 253-288-5970.
Frequently asked questions
- What is the Contractors Material and Test Certificate for?
- It records details about a fire alarm or fire detection system, its installed equipment, pre-testing, monitoring, and test results for Fire Department acceptance testing.
- Who completes this certificate?
- The form requests information about the installing company and contractor, facility, equipment, and system testing, and includes a signature and date.
- How do I submit the Contractors Material and Test Certificate?
- Completely fill out the certificate and fax it to the Valley Regional Fire Authority Fire Marshal’s Office at 253-288-5970.
- Do I need a notary for the Contractors Material and Test Certificate?
- No. The certificate is signed and dated without a notary, and the form does not identify an attachment or related step that must be notarized or sworn.
Need something notarized?
This Contractors Material and Test Certificate doesn’t need a notary — but if you have another Auburn form that does, a commissioned online notary can help.
