Auburn, WA · King County
Stormwater Site Plan Report and Construction Stormwater Pollution Prevention Plan Short Form
This short form collects stormwater site plan and construction pollution prevention details from people proposing a project in Auburn.
What this form is
Use this report to describe a proposed project’s existing and planned site conditions and address stormwater requirements, including construction pollution prevention. It asks for project and property details, area calculations, drainage patterns, site conditions, source control measures, and proposed improvements. The form also requests maps, figures, or photos where applicable and identifies permits and approvals for the project.
Who needs it
People preparing a project in Auburn who need to document site conditions and construction stormwater pollution prevention can use this short form.
How to submit it
Submit it to the city department named on the form; check the city website for current contact details.
About notarization
This document is completed without a notary; no notarized or sworn attachment is identified, so the preparer completes and dates the report.
How to submit this form
- 1
Download The Form
Download the Stormwater Site Plan Report and Construction Stormwater Pollution Prevention Plan Short Form.
- 2
Complete Project Details
Enter project, property owner, applicant, preparer, and project area information, then describe existing and proposed site conditions.
- 3
Gather Supporting Materials
Prepare applicable maps, figures, photos, and other documentation requested for site conditions and drainage.
- 4
Submit To The City
Submit the completed form to the city department named on it; check the city website for current contact details.
Frequently asked questions
- What does the Stormwater Site Plan and SWPPP Short Form ask for?
- It requests project details, site area calculations, existing and proposed conditions, drainage information, applicable source control measures, and supporting maps, figures, or photos.
- Who uses this short form in Auburn?
- People preparing a project in Auburn can use it to describe site conditions and document stormwater planning and construction pollution prevention.
- Do I need a notary for the Stormwater Site Plan and SWPPP Short Form?
- No. The form has no notary block, and its text does not identify a notarized or sworn attachment; the preparer completes and dates the report.
- How do I submit the Stormwater Site Plan and SWPPP Short Form?
- The document text does not give submission instructions. Submit it to the city department named on the form; check the city website for current contact details.
Need something notarized?
This Stormwater Site Plan Report and Construction Stormwater Pollution Prevention Plan Short Form doesn’t need a notary — but if you have another Auburn form that does, a commissioned online notary can help.
