Avondale, AZ · Maricopa County

No notary required

Minor Land Division Application

Property owners and applicants use this application to request city review of a minor land division creating three or fewer lots from land not previously platted.

What this form is

The application requests city review of a minor land division to create three or fewer lots from land that has not been previously platted. It asks for property, project, applicant, and owner information, and includes an acknowledgment checklist and plan submittal requirements. The checklist calls for original applicant and owner signatures, an owner authorization form, maps, surveys, and other supporting documents.

Who needs it

Applicants seeking to divide previously unplatted land into three or fewer lots should complete this application and provide the listed supporting materials.

How to submit it

The checklist says to scan each checklist item as a labeled, dated PDF and upload it to the permit portal. The application lists a $460 base fee.

About notarization

This document is signed without a notary; the applicant and owner sign and date the application, and the checklist also requires the applicant’s signature and date.

How to submit this form

  1. 1

    Download The Application

    Download the Minor Land Division Application PDF.

  2. 2

    Complete The Application

    Fill in the property, project, applicant, and owner information, then have the applicant and owner sign and date it.

  3. 3

    Gather Supporting Materials

    Use the checklist to gather the required owner authorization, maps, surveys, reports, and other supporting documents.

  4. 4

    Prepare PDF Files

    Scan each checklist item as a labeled, dated PDF.

  5. 5

    Upload To The Permit Portal

    Upload the PDF checklist items to the permit portal, as directed by the application checklist.

Frequently asked questions

Who uses the Minor Land Division Application?
Applicants seeking city review to create three or fewer lots from land that has not been previously platted use this application. It requests property, project, applicant, and owner information.
What supporting materials does the application checklist request?
The checklist includes an owner authorization form, legal descriptions, a boundary closure report, an ALTA survey, a title report, a project narrative, a division or lot combination map, and other listed items.
Do I need a notary for the Minor Land Division Application?
No. This document is signed without a notary; the applicant and owner sign and date the application, and the checklist also requires the applicant’s signature and date.
How do I submit the Minor Land Division Application?
The checklist says to scan each checklist item as a labeled, dated PDF and upload it to the permit portal. The application lists a $460 base fee.

Need something notarized?

This Minor Land Division Application doesn’t need a notary — but if you have another Avondale form that does, a commissioned online notary can help.