Paradise Valley, AZ · Maricopa County

No notary required

Right-of-Way and Engineering Permit Application

Utility companies and licensed contractors use this application to request a Paradise Valley permit for work in the public right-of-way.

What this form is

The Town of Paradise Valley uses this application for right-of-way and engineering work, including construction, excavation, utility work, and street cuts. It asks for applicant and contractor details, work location and type, contact information, insurance information, and emergency contacts. Applicants must attach construction plans for review and approval; the document also describes permit conditions, fees, and a performance guarantee.

Who needs it

Utility companies and licensed general contractors or subcontractors licensed to work in the right-of-way use this application for their proposed work.

How to submit it

Email the permit application to [email protected]. The document says changes to the application must be emailed there and approved before construction.

About notarization

This application is signed and dated without a notary; the document lists no notarized or sworn attachment, so the applicant just signs and dates it.

How to submit this form

  1. 1

    Download The Application

    Download the Right-of-Way and Engineering Permit Application PDF.

  2. 2

    Complete The Application

    Provide applicant and contractor details, work location and type, contact information, insurance information, and emergency contacts.

  3. 3

    Gather Required Plans

    Attach one set of construction plans for review and approval. For subdivision and water or sewer line projects, provide a CD or USB drive of Town-approved plans in PDF format.

  4. 4

    Email The Application

    Email the application to [email protected]. Email any changes there for approval before construction.

Frequently asked questions

Who uses the Right-of-Way and Engineering Permit Application?
Utility companies and licensed general contractors or subcontractors licensed to work in the right-of-way use the application for proposed work.
What should I include with the application?
The document asks applicants to attach one set of construction plans for review and approval. Subdivision and water or sewer line projects require a CD or USB drive of the Town-approved plans in PDF format.
How do I submit the Right-of-Way and Engineering Permit Application?
Email the application to [email protected]. Changes to the application must also be emailed there and approved before construction.
Do I need a notary for the Right-of-Way and Engineering Permit Application?
No. The application is signed and dated without a notary, and the document lists no notarized or sworn attachment.

Need something notarized?

This Right-of-Way and Engineering Permit Application doesn’t need a notary — but if you have another Paradise Valley form that does, a commissioned online notary can help.